Hydroelectricity: the energy produced in Haute Maurienne

Electricity from hydraulic sources is a 100% renewable energy without greenhouse gas emissions. With the dams of Aussois (Plan d'Amont and Plan d'Aval), Mont Cenis and Bissorte, the Haute Maurienne Vanoise is home to enormous reservoirs of water.
With its 320 million m3, the Mont Cenis is the largest rockfill dam in France.

The Mont Cenis dam

Since the beginning of the 20th century, the Mont-Cenis plateau, whose waters flow naturally towards Italy, had been developed for hydroelectric production. After the Second World War, following the Peace Treaty of 1947, the border that passed through the Mont-Cenis pass was moved in favor of France, which thus recovered the entire plateau, an ideal position to build a large dam. The new dam, built by EDF between 1962 and 1969, created a reservoir with a capacity of 320 hm3, shared between the two countries at the rate of about 1/5 for Italy and 4/5 for France.

With its 120 m height and 1.4 km length, the Mont-Cenis dam is the main element of the hydraulic development of Haute Maurienne Vanoise. It is a "gravity dam", which means that it opposes its enormous mass of rock to the pressure of the water. To fill it, water has been collected from Bonneval sur Arc, for example. The reservoir is even connected to the Plan d'Aval dam, in Aussois on the other side of the valley! A set of galleries and penstocks allow, by a complex game of turbining and pumping, to transfer water from one reservoir to another to supply, according to the needs, the power plants of Villarodin, Avrieux and Aussois.

The Mont-Cenis site has been the subject of a program of work aimed at improving the landscape and preserving an international heritage, including the rehabilitation of the Grand-Croix mountain pasture, the undergrounding of power lines and the creation of a Franco-Italian network of hiking trails. The water from this development is also used in part for the production of artificial snow in several ski resorts in Haute Maurienne Vanoise.

HMV_decouvrir-environment-hydrolectricity-centralevillarodin
France's final play-offs

The Mont Cenis dam is the last one in France to be guarded because of its location on the border between France and Italy. The barragists, one French and one Italian, spend several days on the site to survey the kilometers of galleries that crisscross the mountain, to take readings and to check the quality of the installations.

HMV_decouvrir-environment-hydroelectrocite-barragesaussois
The dams of Plan d'Amont and Plan d'Aval

At the end of the 1930s, the Société Hydroélectrique de Savoie (SHES) wanted to create the Plan d'Amont and Plan d'Aval reservoirs, above Aussois, to improve the production of its electrometallurgical plants in the valley. The works, started in 1939, were interrupted by the Second World War, then resumed by EDF at the end of the conflict. For the anecdote, or for the movie lovers, the construction site was used as a set for the movie "La Meilleure Part" with Gérard Philippe.

Above the Plan d'Aval dam, the platform of the old cable car which was used for the works, has been fitted out as a belvedere. Panels give information on the dams, the power plants but also the landscape and the environment. Since 2016, it is also possible to cross the dam of Plan d'Aval, in particular to make a 2h walk around the reservoir (for the amateurs of bicycle, it is also possible to make a superb cross-country course). You will be able to discover an amazing black sand beach and even, if the season allows it, taste some wild raspberries that grow along the path.

The hydroelectric power plants of Villarodin, Aussois and Avrieux
The Villarodin power plant

Built at the time of the Mont Cenis development, the Villarodin power station, at the foot of La Norma, has the particularity of being fed by the waters of 2 structures: the Plan d'Aval reservoir on the Aussois side and the Mont Cenis dam on the Val Cenis side. In 1968, when it was commissioned, the Villarodin power station held the world record for power with its 180,000 kW produced by each of its 2 Pelton turbines. Designed to supply electricity during peak demand, the plant can start up in a few minutes and supply the French electricity grid very quickly.

Because of its architecture and history, the Villarodin power plant is part of the cultural discovery itinerary Les Chemins de l'hydroélectricité: accompanied by Facim Foundation guide-lecturers, it is possible to visit the power plant in the summer and discover its links with the development of the territory, from its construction to the present day.

The power plants of Aussois and Avrieux

The Aussois power plant, in Savoie, was commissioned in 1950. The power station is equipped with 3 Pelton type turbines. It turbines the water coming from the Plan d'Aval reservoir, thanks to a metallic penstock. This pipe feeds either the hydroelectric power station of Aussois, or the wind tunnel of the ONERA center of Modane-Avrieux, located just next door (wind tunnel of aerodynamic tests of the National Office of Studies and Aerospace Research). A good example of coexistence on the same site of
hydroelectricity and hydromechanics

The Avrieux power station is the oldest of the Haute Maurienne Vanoise hydroelectric group. Started in 1917, the construction was only completed in 1923. It is fed by the dam of Bramans. With its particular architecture, and its impressive engine room, it is open to the visit in summer on registration.

The equivalent of 2 x the electrical consumption of Savoie

The Haute Maurienne Vanoise dams supply 10 hydroelectric power stations: Bissorte, Super-Bissorte, Orelle, Villarodin, Combe d'Avrieux, Aussois, Avrieux, Plan d'Amont, Le Carrelet, Bois d'Aussois.

These developments produce, on average, each year the equivalent of 2 times the residential consumption of the Savoie department.

The Bissorte and Super-Bissorte power plants

At the entrance of the Haute Maurienne Vanoise, the Bissorte and Super-Bissorte power plants, located in the communes of Le Freney and Orelle, turbinate the waters of two reservoirs: the Bissorte dam at high altitude, and the Pont des Chèvres dam, located along the road.

Commissioned in 1986, the Super-Bissorte power station is one of six French pumped-storage power stations (STEP), the principle of which consists of transferring the same water between two reservoirs separated by a steep slope. This system allows the water to be reused, as in a closed circuit. During periods of high demand for electricity (morning, day and evening), water from the high altitude dam (Bissorte dam), descends to the power plant through a penstock. Powered by the water, the turbines produce energy. But instead of being returned directly to the river, the water is stored again in the lower reservoir (Pont des Chèvres dam). At night, when the demand for electricity is low, the water is pumped back to the Bissorte dam. The next day, the circuit can start again...

Super-Bissorte is a generation facility of national interest, capable of injecting approximately 800 MW (Bissorte and Super-Bissorte combined) in a few minutes into the electrical grid to meet a peak in electricity consumption.

 